【Extension and Retractable】 The pantograph for photography lighting can be adjusted freely within a height of 43-200cm, and the maximum carrying capacity: 15kg. It can meet the needs of supplementary light at any position.
【Convenient and Safe】 Move all your studio flash devices to the position and height you need, no longer need cumbersome cables and tripods on the ground. It not only saves floor space, but also effectively avoids over-winding of cables.
【Flexible dimming】 Through the ceiling guide system of the studio, the light position can be adjusted in all directions from front to back, left to right, and up and down to meet the needs of different positions.
【Packing List】 1.5M single track × 2pcs; 1.5M double track × 2pcs; 100×100MM fixed plate × 4pcs; lamp trolley × 4pcs; universal trolley × 4pcs; cable trolley × 4pcs; Pantograph×4pcs; safety cord×4pcs.
【Installation and Service】With paper version installation instructions. We can provide detailed installation videos. If there are any problems during installation and use, please contact us in time and we will solve it for you as soon as possible.
Installation Instructions for Ceiling Rail Systems
Step 1 of installation Measure and mark the installation distance on the ceiling. Install the fix plate on the ceiling.
Step 2 of installation Pass one end of the single track through the fix plate. Tighten the screws on the fix plate to fix the track. (Fix another single track to the ceiling in the same way).
Step 3 of installation Slide one side of the double pulley into the single track, and then slide the double track into the other side of the double pulley, so that the double track and the single track are connected together by the double pulley.
Step 4 of installation Install screws on both ends of the track to prevent items on the track from slipping out of the track. All rails are equipped with gag screws
Step 5 of installation Install the pantograph on a single pulley The pantograph can move freely on the monorail with the pulley and has brake pads.
Step 6 of installatio Connect the light fixture to the lower end of the pantograph. Use the safety rope to connect the pantograph to the luminaire to prevent damage from accidental fall of the luminaire
In The Box
2x 1.5M Single Track (fixed tracks)
2x 1.5M Double Track (movable tracks)
4x 100*100MM Fix Plate
4x Single Pulley
4x Double Pulley
4x Cable Pulley
4x Pantograph
4x Security Rope
【Extension and Retractable】 The pantograph for photography lighting can be adjusted freely within a height of 43-200cm, and the maximum carrying capacity: 15kg. It can meet the needs of supplementary light at any position.
【Convenient and Safe】 Move all your studio flash devices to the position and height you need, no longer need cumbersome cables and tripods on the ground. It not only saves floor space, but also effectively avoids over-winding of cables.
【Flexible dimming】 Through the ceiling guide system of the studio, the light position can be adjusted in all directions from front to back, left to right, and up and down to meet the needs of different positions.
【Packing List】 1.5M single track × 2pcs; 1.5M double track × 2pcs; 100×100MM fixed plate × 4pcs; lamp trolley × 4pcs; universal trolley × 4pcs; cable trolley × 4pcs; Pantograph×4pcs; safety cord×4pcs.
【Installation and Service】With paper version installation instructions. We can provide detailed installation videos. If there are any problems during installation and use, please contact us in time and we will solve it for you as soon as possible.
Installation Instructions for Ceiling Rail Systems
Step 1 of installation Measure and mark the installation distance on the ceiling. Install the fix plate on the ceiling.
Step 2 of installation Pass one end of the single track through the fix plate. Tighten the screws on the fix plate to fix the track. (Fix another single track to the ceiling in the same way).
Step 3 of installation Slide one side of the double pulley into the single track, and then slide the double track into the other side of the double pulley, so that the double track and the single track are connected together by the double pulley.
Step 4 of installation Install screws on both ends of the track to prevent items on the track from slipping out of the track. All rails are equipped with gag screws
Step 5 of installation Install the pantograph on a single pulley The pantograph can move freely on the monorail with the pulley and has brake pads.
Step 6 of installatio Connect the light fixture to the lower end of the pantograph. Use the safety rope to connect the pantograph to the luminaire to prevent damage from accidental fall of the luminaire
In The Box
2x 1.5M Single Track (fixed tracks)
2x 1.5M Double Track (movable tracks)
4x 100*100MM Fix Plate
4x Single Pulley
4x Double Pulley
4x Cable Pulley
4x Pantograph
4x Security Rope